We specialize in constructing top-quality commercial buildings that meet the needs of our clients. Our team is equipped to handle any size project, delivering exceptional results every time.
Our experienced team of builders creates beautiful and functional homes that exceed our clients' expectations. We work with you to design and build a home that is uniquely yours.
We specialize in renovations that transform your space into something you'll love. From updating your kitchen to adding a new room, we work with you to bring your vision to life.
Our experienced project managers ensure that every project is completed on time and within budget. We handle all aspects of the project, so you don't have to worry about a thing.
We work closely with our clients to create custom homes that reflect their unique style and needs. Our team is dedicated to making your dream home a reality.
We are committed to building sustainable and energy-efficient buildings that are environmentally friendly. Our team uses the latest technology and techniques to minimize our impact on the environment.
1. ls there AVAILABILITY of SIZE STONES as per daily requirements?
2. Are the HEARTING, BOND, QUOIN & FACE STONES properly hammer dressed to obtain desirable shapes
3. Is the ALIGNMENT & LOCATION of masonry as desired?
4. Is the WETTING of size stones being ensured?
5. Is the MORTAR MIX PROPORTION as specified?
6. Is the staggering of VERTICAL JOINTS being ensured?
7. Is the THICKNESS OF MORTAR JOINTS as specified? ((, Get a Quote..
8. Are the DIMENSIONS & LEVELS as per drawings?
9. Is the PACKING of interstices within masonry with stone chips effective?
10. Is the CLEANING & RAKING of joints being done?
11.Is the CLEANING OF DEAD MORTARcompleted?
1. Is the BAR BENDING SCHEDULE prepared?
2. Is the bar bending schedule AVAILABLE for reference?
3. Is the CUTTING & BENDING OF BARS as per BBS?
4. Check for CLEANLINESS of bars.
5. Is the FIXING OF BARS correct as per construction drawings?
6. Is the TYING OF REINFORCEMENT with BINDING WIRE satisfactory?
7. Check for LOCATION of service conduits.
8. Check for READINESS of reinforcement to release for Concreting:
1. Is the CLEANLINESS of forms acceptable?
2. Check for assembly of scaffolds & shutters w.r.t. SHUTTERING SCHEMES?
3. Check for provision & arrangement of SHUTTERING SCHEME
4. Check for RIGIDITY of assembled forms.
5. Check for CONFORMANCE of the assembled forms according to the DIMENSIONS, SHAPES, LINES & GRADE in the drawings?
6. Check for SEALING OF JOINTS & HOLES in shutter forms
7. Check for SEALING OF JOINTS & HOLES in shutter forms.
8. Check for READINESS of shutter forms for release to fix reinforcement.
9. Check for removal of shutter forms & scaffolds after SPECIFIED DURATION.
10. Check for CLEANING of scaffolds & shutters (post-removal).
11. Check for PROPER STACKING of scaffolds & shutters (post-removal).
1. Are the PRECEDING ACTIVITIES like fixing of service conduits, water supply & sanitation lines COMPLETE?
2. Check for RAKING of MASONRY JOINTS & HACKING on RCC surfaces
3. Check for CLEANING & WASHING of masonry & RCC surfaces.
4. Check for SUITABILITY & SAFETY of scaffolding.
5. Check for REMOVAL of mold-releasing agent stains from the exposed concrete surfaces.
6. Check for AVAILABILITY of cement & o fine fne nderegate aggregate for for plastering.
7. Check for PROPER MIXING of MORTAR.
8. Check for MORTAR MIX PROPORTION.
9,. Check for ADDITION of WATERPROOFING COMPOUND, if specified.
10. Check for completion of CEILING PLASTER prior to plastering.
11. Did the PLASTERING start from the top and work its way downwards to the floor?
12. Check for THICKNESS & NUMBER OF COATS of plaster.
13. Check for a true level surface, right angles & plumb.
14.Is the MORTAR being consumed within the initial setting time of cement?
15. Check for STRAIGHT EDGES, SHARP CORNERS & SMOOTH FINISH
16. Check for ARCHITECTURAL FEATURES such as grooves, bands, etc
17. Check for TRUE LEVEL SURFACE & SMOOTHNESS of plaster. 18. Check for REMOVAL of dead mortar & debris
19. Check for SEALING OF OPENINGS in masonry for scaffolds.
20. Is the DATE OF PLASTERING marked on the plastered walls?
21. Check for CURING ARRANGEMENTS?
22. Check for curing up to SPECIFIED DURATION.
1. Is the FFL given from the PROJECT'S TEAM correct & verified?
2. Is BUTTON MARK LEVEL on the wall for plastering correct?
3. Have the BOXES been fixed according to the button mark?
A Are all of the FIXED BOXES in one level?
5. ls the SPACING between adjacent BOXES correct?
6. Are the required TOOLS for CHIPPING available?
7. Has the RIGHT ANGLED CHIPPING been ensured at the corner of the chipped area?
8. Have the CONDUITS been inserted into the box?
9. Is the PROPER SIZED BOX fixed?
10. Check for completion of PROPER CURING for all the places where chasing/chipping has been done. Is it filled with CONCRETE/CEMENT MORTAR?
1. Are the latest GFC drawings for the activity available?
2. Are all the REQUIRED TOOLS available?
3. Has the necessary CLEARANCE from the CIVIL EXECUTION TEAM been given to start the plumbing work?
4. Has the CUTOUT been provided as per the approved drawings?
5. Has the BLOCK WORK PLASTERING & WATERPROOFING been completed?
6. Has the MARKING of INTERNAL PLUMBING LINES on the walls been done accurately according to the meter marking?
7. Have the THREADED JOINTS been properly covered with Teflon tape?
8. Has the CONCRETE PACKING been done properly wherever required?
9. Have the OUTLET LEVELS been leveled properly using spirit level?
10. Is the height of PLUMBING FIXTURES as per drawings?
11. Check for PROPER CURING for the concrete that has been packed
12. As per requirement, is the PROPER SLOPE being maintained for sewage and wastewater lines?
13. Are the sHAFTs for TOILETS, fixing of CLAMS using ANCHOR BOLTS for holding pipes in position been fixed away from the bore packing area?
14.Is PROPER SLOPE being maintained To1 for the le same same as as prescribed prescribed in the drawings?
15. Check for the SOIL LINES connection to the inspection chambers at the ground level or at the basement.
16. Check if the WASTEWATER LINES are connected to the gully traps at the ground level or at the basement and then connected to the inspection chambers
17. Check if all the TRAPS are sealed with a gunny bag & a layer of PLASTER OF PARIS at the top to minimize the choke-up problem.
18. Check for the COMPLETION of PROJECT as per the floor plan & elevation.
1. Check for CLEANLINESS of the base surface. Has the loose mortar & debris been removed from the work area?
2. Have the preceding activities (fixing of doors, partitions, false ceiling, etc) been COMPLETED?
3, Check for PROVISION of service conduits, junction boxes, etc
4. Is the APPROVED PATTERN of LAYING available for reference?
5. Are SLOPES for the tiled surface finalized?
6. Check for availability of TILES & other construction aids
7. Check for availability of TILING MASONS.
8. Is the MORTAR MIXING PROPORTION as specified?
9. Is the THICKNESS OF MORTAR BED acceptable?
10. Check for PATTERN of LAYING.
11. Check for the THICKNESS of JOINTS between tiles.
12. Check for TILING around doors, sanitary fittings, columns, partitions, etc
13. Check the FINISHING of EDGES for cut tiles
14. Check for the ADDITION of PIGMENT to cement, if required
15. Check for CURING OF TILING for the specified period.
16. Check for CLEANING of the tile surface
17. Check for GRINDING & POLISHING
18. Final check for TRUE LEVEL SURFACE, PATTERN, SURFACE FINISHES, SLOPE, etc
1. Are the MANUFACTURER'S SPECIFICATIONS for painting available for reference?
2. Check for AVAILABILITY of APPROVED SHADE DETAILS
3. Check for cleaning of WALL & CEILING. Is it free from dead mortar, dirt, dust, algae, grease, etc?
4. Check for FILLING OF PITS or UNDULATIONS in the PLASTER.
5,. Check for SUITABILITY & SAFETY of scaffolding.
6. ls the SCAFFOLDING erected away from the surface so as to protect the surface from being painted?
7. Check for AVAILABILITY of a sufficient number of plastic emulsion containers.
8. Check for availability of PAINTING GROUPS
9. Check for PRIMER APPLICATION,
10. Is the PROPORTION of PAINT & WATER MIX as per the manufacturer's specifications?
11. Check for the CONSISTENCY of PAINT.
12. Check for UNIFORM APPLICATION of PAINT
13. Check the NUMBER OF COATS
14. Check the INTERVAL TIME between two coats.
15. Check for REMOVAL of scaffolds & cleaning.
1. Check for plumb for the doorframe with respect to MASONRY OPENING
2. Check for plumb for the doorframe with respect to MASONRY OPENING.
3. Check for PLASTERING of WINDOW FRAMES to walls by screws.
4. Check for DIMENSIONS OF JAMBS & REVEALS.
5. Final check for PAINT, SURFACE FINISHES & GLAZING,
6. Check for REMOVAL of protective coating & cleaning of the aluminum door before handover.
1. We design the structure/frame arrangement based on the requirement and ensure that it's aesthetic in nature.
2. We design structural elements depending on the loads & design them keeping economy and elegance in mind, guaranteeing a safe, serviceable and durable structure.